2010年P(guān)MP美國項目管理考試習(xí)題及答案六十七
QUEST The Risk of NOT meeting project quality objectives: 
A can be minimized through continuous monitoring. 
B considered a long term risk. 
C will be reflected in the "in-service" life of the product or service. 
D B and C 
E All of the above. 
參考答案:E
QUEST The "zero defect" concept was proposed by: 
A Deming 
B Juran 
C Crosby 
D Tagushi 
E A and D only 
參考答案:C
QUEST The use of quality circles: 
A has proven ineffective in both Japan and the U.S. 
B is particularly effective in overcoming labor/management conflicts. 
C provides a quick fix for most quality problems. 
D allows workers the opportunity to generate solutions for chronic quality problems. 
E A and B only 
參考答案:D
QUEST In a flowchart, the diamond form is used to represent: 
A a starting point. 
B an operation. 
C a written report. 
D a decision point. 
E an end point. 
參考答案:D

QUEST In a  fishbone diagram, the effect you are concerned about is placed: 
A at the right-hand end of the spine. 
B at the end of the diagonal line (i.e. "fin"). 
C on a branch of a fin. 
D at the left-hand end of the spine. 
E None of the above. 
參考答案:A